- Main products: Series resonance test device, Transformer tester, Circuit breaker, switch tester, High Voltage Insulation Equipm, Relay Protection Products, Cable and cable fault tester, Arrester and Insulator Test In, SF6 Test Instrument, Oil Testing Instrument, DC System and Battery Test Ins, Ground/Insulation Resistance T, Power Energy Analyzer, Power Energy Analyzer
Operation Method Of Transformer Voltage Test Control Box
2021-04-28 10:27:56
Pressure test control box, using advanced microelectronic processing technology, all use process can be set in advance, all Chinese interface, simple operation. After all test items are set, the pressure test control box can be tested automatically without manual intervention.
1. According to the relevant regulations, set up the site, connect the equipment connection, and there should be special personnel in charge of safety in the area where conditions permit.
2. The current relay (KA) should be adjusted according to the capacity and voltage level of the tested object before the operation of the voltage withstand test control box.
3. Turn on the power switch, press the power transmission button, the contactor is closed, the live power signal light of the voltage regulator is off, and the power transmission signal light is on. At this time, the boost test can be carried out.
4. Turn the handle of the voltage regulator slowly clockwise (press the rising button on the electric console) and pay close attention to the voltmeter (it is appropriate to increase the voltage at the speed of 3KV per second). When the voltage is increased to the specified withstand voltage value of the tested object, press the timing button in time and pay close attention to the condition of the tested object.
5. When the specified withstand time of the tested object is reached, an alarm (Bell) will sound in the table (box), indicating that the tested object is qualified for withstand voltage. At this time, turn the handle of the voltage regulator anticlockwise (press the down button on the electric console) to make the voltage regulator return to zero. And press the stop button to cut off the power.
6. In case of over-voltage in the process of voltage rise or voltage withstand test, the voltage regulator knob shall be turned anticlockwise in time (the electric console presses the down button) to make the voltage return to the specified value.
7. During the test, if the current indication of the ammeter exceeds the specified range of the tested object, the boost voltage shall be stopped immediately, and the relevant reasons shall be found out before the test.
8. In case of short circuit, flashover, breakdown and other over-current in the process of voltage rise or voltage withstand test, the current relay will act to make the voltage regulator cut off automatically, indicating that the tested product is unqualified. At this time, return the voltage regulator to zero and reset the timing button for the next operation.
-
Rexroth proportional pressure relief valve 0811402036 DBETX-10/50G24-8NZ4M
-
Rexroth DIRECTIONAL SPOOL VALVE R900561274 WE6D6X/EG24N9K4
-
Rexroth DIRECTIONAL SPOOL VALVE R900568233 4WE 6 W62/EG24N9K4
-
Rexroth PRESSURE REDUCING VALVE DRE6X-12/175MG24-8NZ4M 0811402055
-
Festo flow sensor SFAB-200U-WQ8-2SA-M12
-
ITD21H01 02048 H NIS21SG8 E 14IP65 019 Sensors & switches from BAUMER ELECTRIC
-
ABB EC24V 086362-001
-
ABB A5E03545935/A10000092.54
-
GE IS415UCVHH1A
-
GE IS215VPWRH2A
-
GE IS215VPROH1B
-
GE IS215VCMIH2B
Popular Searches
- power transformer
- Distribution Service
- current transformer
- power transformers
- High Frequency Transformer
- Electrical Transformer
- energy saver device
- led transformers
- step up converter
- Ac Drive Converter
- Frequency Drive Converter
- lightning conductor
- Copper Lightning Rod
- electronic transformer
- Lighting Transformers
- toroidal transformer